STENA LINE | STENA TRANSIT & TRANSPORTER

As regulations are demanding vessels to be cleaner, we assisted Stena Line with the integration of a Wärtsila scrubber system.

For this project C-Job Naval Architects made the detail design together with Damen Shiprepair Amsterdam for the Scrubber integration on the Stena Transit & Transporter Ferries.

To be able to fit the Scrubbers in the funnel, it needed to be extended in height and width. The piping system is designed with the use of a full laser scan of the engine room and funnel, together with multiple visits onboard of the vessel. This resulted in a design that fits the existing engine room seamlessly without making big changes. The installation will be done Oktober 2015 at Damen Shiprepair in Amsterdam.