P&O Maritime | Cable-Laying Vessel (CLV)
C-Job supported P&O Maritime Logistics with the design of a cable-laying vessel by repurposing an existing module carrier vessel. With the increasing demand in the offshore wind sector, this vessel will be able to meet the operational demands for the installation of next-generation windmill infrastructure thanks to its optimized deck layout.
Furthermore, in close cooperation with P&O Maritime Logistics, C-Job created a design that was best suited to their operational profile. The design focused on optimized vessel performance and features a DP-2 positioning system and a low-fuel consumption propulsion layout that is ready for green methanol fuel and zero emission operations.