Let's get in touch

Wherever you are in the world, C-Job’s project managers, naval architects and engineers are ready to support your vessel or fleet challenge. Our independent design and performance expertise is centred on your needs, helping tailor services, designs and technologies that strengthen the business case and support confident decisions.

Contact our Ship Design & Performance Center

You can also email us directly at info@c-job.com

Our experts

Job Volwater

Founder – CEO – BD Cruise & Defence

+31 88 0243 700

sales@c-job.com

Basjan Faber

Founder – BD Dredging & Inland

+31 88 0243 700

sales@c-job.com

Wouter den Boer

CCO

+31 88 0243 700

sales@c-job.com

Andreas Orgetas

BD Ferries & Workboats

+30 2111 99 6116

athens@c-job.com

Nikos Papapanagiotou

Managing Director Athens

+30 2111 99 6116

athens@c-job.com

Spiros Georgakopoulos

Product specialist Workboat

+30 2111 99 6116

athens@c-job.com

Georgios Synetos

Product specialist Cruise & Ferry 

+30 2111 99 6116

athens@c-job.com

Thijs Velner

Product specialist Offshore 

+31 88 0243 700

info@c-job.com

Matthys Dijkman

Product specialist TSHD

+31 88 0243 700

info@c-job.com

Marco Lambalk

Product specialist CSD

+31 88 0243 700

info@c-job.com

Jeroen Jungschlager

Product specialist Superyachts

Case studies

600-passenger vessel – for a German cruise company

C-Job supported a family-owned cruise company when a ship needed Tier III modifications to become compliant with Norwegian Heritage Fjords and Mediterranean sailing regulations. This required a comprehensive upgrade to the vessel's power system.

E-Pusher 1 – for Kotug

C-Job worked with Padmos, a family run shipbuilder, on behalf of their client and shipowner, Kotug. In 2021, Kotug launched its E-Pusher concept of fully electric pusher boat and barges, which are a world first. The concepts were created by Kotug, and C-Job collaborated with Padmos on the basic and detailed engineering for the first of these vessels, the E-Pusher 1.

Green Jade – for CSBC

C-Job supported CSBC with basic design and main crane integration for the Green Jade, the first heavy lift and offshore wind installation vessel built in Taiwan. The vessel, which features a crane with 4,000 tons of lifting capacity and DP3 capability, was launched by CDWE, a joint venture between CSBC and DEME Offshore, and entered service in 2023.